Subject = OPERATIONAL SUMMARY   24 FEB 91 G DAY                           

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = COMMAND REPORT  AFTER ACTION REPORT ENGINEER GE CELL                                            

Document Number =          5

Box ID = BX000525







                         A) aMERr OPMMCNS: VII Corps Engineers continue to
             support maneuver forces. Effort is concentrated in mobility operation by
             construction and repair of MSRs and Division Routes. We will begin to
             mark enemy obstacles and unexploded ordnance. Engineer will assist BCD
             Detachments in clearing this ordnance and the abandoned enemy equipment.
             Will begin clearing and repair of MSR Donahue on 2 MAR 91.

                         B) ENGBIF@M ISSUES:

                            1. Engineer Mnitions. MICTJC. Need X4CCC14 to approve and
             instituticmlize the fixes. Other units should not have to continue
             experimentation. Extensive destruction efforts are rapidly depleting
             Corps Stocks for Blasting Caps, Det Cord, Tim Fuze, and Fuze Ignitors.
                            2. Equipment Issues. 7 EN BDE still needs additional 916
             tractor assets to haul heavy equipment. German equipment issue only
             replaces 5 of 23 short. RPV Airfield. lesson learned from this operation
             is that the RPV is a resource eater. It needs its own runway material or
             a different rode of launch/rec@. Airfield mattIM, that Must be Moved
             every 2-3 days is just riot the answer. Explosive sniff ing dogs, this
             option for detecting explosives should be explored for use in urban
             areas. Current mine detecting devices are u),--f f ective and u),--f f icieryt on
             modern plastic mines. Replacement platoons arrivuq without equipment
             (MI13s, 5 Thns, crew--erved weapons). Difficult to integrate and still
             maintain unit integrity. Need to get M113S for these units.   Need
             theater reserve for low density engineer equipment, (dozers, scrapers,
             etc) suggest factor from doctrinal publications (FMs) and buy or lease
             comi,--mial replacements for combat losses. Dist Palliative Transport
             still needs method of spreading palliative. Need to maintain MSRs is
             critical now as before. As hostilities end, can envision use of contract
             vehicles and drivers. Need to reopen the pipeline. we are not getting
             any crude oil.

                         C)  PRIORITY OF WOW: Not reported

                         D)  PRIORITY OF EFTORT: Nat reported

                         E)  TOPOMMEC SUPPORT: Nat reported

                         F)  PROPOSED OPERATIONS:

                             1. Engineers assigned to 2ACR, 1AD and 3AD are supporting
             unit mobility and providing division supply routes. 3AD has ompleted
             construction of Corps MSR Burgundy to Objective Collins. 176 EN GRP is
             establishing LOGBASE NMLITZEN to include the road net and MSR Blue. 109
             EN GRP has responsibility for the Corps rear to include maintenance of
             M(3RS. 926 EN GRP dropped back to BDE control. Will be consolidated vic
             Ob]ective Dorset. Due to lack of haul assets (only 50% of tractors auth)
             will take time to consolidate. Follow on mission to maintain routes
             behind divisions. MSR Green cmplete to LOGBASE NELLIRGEN only. MSR Blue
             to IPSA vic Pr8500. MSR Burgundy to PU447190 and is completes







                                              G+5 PG 6

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997