Subject = OPERATIONAL SUMMARY   24 FEB 91 G DAY                           

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = COMMAND REPORT  AFTER ACTION REPORT ENGINEER GE CELL                                            

Document Number =          5

Box ID = BX000525




                                      UNCLASSIFIED
                                        02 MAR 91/G+6

           I.  OPERATICNAL SUMMARY


               A. FRAGOS ISSUED: None

               B. TASK ORGANIZATION: No charige, See Arglex A

               C. = AFDUVALS: None

           IT. LOGISTTCAL SUMMARY: IOGSM INPUT (ParagraPhs 4 and 9)
           4(U@+ aA'3S IV: No awiGE.
           94U@* ENGINEER DATA:
                                                                                    f4i
               A. Pola CONSIRUCrION/REHAB: NO CHANGE.

               B. A=ELD 19JNTENANCE AND REPAIR: NO CHANGE-


               C. THEATER MAIN SUPPLY ROUIE MAINTENANCE AND REPAIR: NO CHANGE.

               D. PIPELINE CONSIR=ON: MME V: 172/193 ]KM LAID AND COUPIM;    112
           KM A=GM AND TE=. POC CPr BLECKMAN 7804-449.


               E. Ngq @MM SOURCES: NO CHANGE.


               F. OTHER.

                   1) EPW CC14POUNDS: BOTH THEATER CAMPS ARE OPERATIONAL WITH
           CAPABILITY To HANDLE FULL CAPA=. MW CONTINUES ON A TAM= MTER
           ODILEMCN SY= AT BOTH SITES TO UPGRADE AN INTERIM EXPEDIENT. POC CPT      w
           BLECKMAN 7804-449.                                                       C#n
                                                                                    04
                   2) SHELTER MATERIAL FOR DISPLACED =LTANS: = NEED TO              w
           OONMRUCR CAMPS IN =HER IRAQ OR MMArr HAS NOT MATERIALIZED. CA UNITS
           HAVE ENPRESSED AN INTEREST TO DRAW SCME OF THE cUiMTER MATERIAL TO
           "REPAIR'L EXISRM FACI=ES IN laW=. SML ATMflyMIG TO LO= THE
           MISSING 190 ROLTS. SHIPMENT FROM ITALY HAS BEEN CONF'IRMED. POC CPT
           BLECEMAN 7804-449.

               G. W@RA=. (FOR CRMM) ARCENT 04M UUM MW PROVIDED CME TO
           THE EGYPTIANS HAVE A@%M MM AND HOW TM WnL GEr T= EQUIPM= BACK.
           HAS CREOM PROVIDED GUIDANCE THROUGH a= SRAFF ADMIKS? IF NOT, IS
           CENTCCM GUIDANCE FORTHCOMING THROUGH EWR OR OTHER S= CRANNELS? ENM       w
           UNITS PLANNING FOR REDEPLOYMENT NEED THIS INFORMATION TO SATISFY 4 MARCH
           SUSPENSE DATES. POC MAJ BUSH 7804-233.

               H. RECE= ACR499LMGED: 416rlH ENGR SMUS RPr #60. POC MAJ BUSH
           7804-233.


           III. SPECIFIC OPERATIONAL ACRI=ES


               A. ARCAM ENGINEER


                   1. FOF&@AM/MB= CP: No entxy


                                          Cv+6 PG 1
                                UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997