Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Parent Organization = CENTCOM
Unit = ARCENT
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Document Number = 5
Box ID = BX000525
2. OPERATTONS: See DA 1594
3. FACI=ES/CDNgn:UMON:
Is A) Theater EPW Carps: Both ERONX and BROOMYN are 98% complete
and can handle 48,000 EPWs each. ReminiM work to improve waste water
collection on both sites does not affect overall capacity.
B) Corps EPW Carps: Operating
C) Pipeline:
1) Phases I through III are complete
2) Phase IV: no demand from UX;BASES; will shut do@m to lay
15 miles of rigid pipe; EM is 5 Mar.
3) Phase V is 193M to ID93ASE M@PM. 178M layed, 178.EM
coupled, 112]KM aligned and tested. Interim completion date is 1 Mar. QM
assets have amsed hauling support. Pipeline unit does not have haul
capability at present. Line is operable to PS#7 (96KM mark); 475th is
preparing a teqmrary station. Final connection to complete 193KM run to
IDMASE A and BCD is 10 Mar. G4 POL plans to cmplete.
D) Patriot Power: DBAHRAN battery is hooked up to cmvercial
pmer. UWUM AB Battery Contractor left the country. 535th EN DEr and
SUP0014 engineer working; no ECD. Transformer being installed at I
Document Page:
First |
Prev |
Next |
All |
Image |
This Release |
Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997