I) Class IV (Construction) :
1) Gravel: Gravel is available for pick-up from quarry vic
NS4062. 155th EN 00 (CS) is on site as augmentation.
2) Dust Palliative: 843 barrels (44,679 gallons) available
at LOGBASE BRAVO. Contract for delivery of 9000 barrels (477,000 gallons)
awarded. 1874 of 2000 barrels delivered as of 27 Feb to Ash-Shubah. 4126
barrels to be split between LOGBASES BRAVO and BCM. Remiru'.ng 3000
barrels and bulk issue option on hold, but available if needed. CERIA)M
RCC24 POC is CPT Alexander.
3) Crude oil: Al-Qaysmnah pump broken; ARAMCO repairing.
No Em. second access point to line will take two weeks to construct; do
not anticipate urgent need then. Bath Corps indicate continuing need for
crude oil. 468K gallon remains on order; expect SOK to leave 3 Mar for
XVIII AEN Corps.
4) Airfield Matting: VII Corps picked up two sets of
XK-19, but cannot find 19 truck loads. LTC Carxiido and r-W4 Hoffman, 800th
MMC, are trying to locate. XVIII ABN Corps rattuig has been delivered to
vic LOG3ASE A-MME. AN2 will be stored at Warehouse 15 at port. Corps
being instructed to turn in Tnattirig to 165th S&S Co at IKKW.
5) Harzard Marking Tape: Contractor delivered red/white
diagonal plastic tape on 26 Feb to 416th ENCO[4. Available at IqM.
6) Barbed Wire: ROC14 procuring 20,000 spools through Host
Nation; delivery delayed to 3 Mar to IOGBASE BRAVO. 14,000 of 45,000 each
1.7m rebar pickets delivered to KKMC on 27 Feb.
J) Contract Status: Reviewing all unstarted construction
projects for need and suitability; will provide input to CENTCOM by 4
mar. initiated staff action to start construction Project Review (CPR)
Board at HQ, ARCERR.
K) MSR Status:
West Range Road Amber, 43 EN BNIS is now DM 1 Mar
East Range Road Red, has been deferred.
SE Dodge Green, shoulder work revised ECD is 24 Feb due to
rain delay/damage.
NW Dodge Green, cold patch work casing minimal traffic
disruption.
Sultan(Nash) Green
NW old Tapline Green
SE Old Tapline Green
XVIII ABN Corps MSRS to LOGBASES Fk%= and OSCAR
Georgia - Amber 6 lanes; due to rain
Montana - Green 6 lanes good to border
Texas - Green 2 lanes; due to rain
Ohio - Green 2 lanes good along border
Virginia - Green 2 lanes gravel
Colorado - Green 2 lanes gravel
G+6 PG 3
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997