B) Corps EPW Caq:)S: Operating
C) Pipeline:
1) Phases I through III are complete
2) Phase IV: no demand from LOGBASES; will shut down to lay
15 miles of rigid pipe, BM is 5 Mar.
3) Phase V is 193Kt4 to LOGBASE ALPHAL. 178Kt4 layed, 178KM
coupled, 112M aligned and tested. Interim completion date is 1 Mar. QM
assets have ceased hauling support. Pipeline unit does not have haul
capability at present. Line is operable to PS#7 (96KK mark); 475th is
preparing a temporary station. Final Connection to complete 193KM run to
LOGBASE A and ECD is 10 Mar. Initial report is that G4 POL plans to
complete.
D) Patriot Power: DHABRAN battery is hooked up to commercial
pudex. DHAMRAN AB Battery Contractor left the country. 535th EN DEr and
SUPCCM engineer working; no BCD. Transformer being installed at IWA
site; revised BCD is 4 Mar. Riyadh AB, on fourth site; project complete.
Fixed generators. Contractors will deliver two generator/trailers on 2
Mar; remainder on 5 Mar. All 12 mobile generators and trailers are now in
country.
E) ARCENT HQ Power: Transformer installed. 416th MOM
procuring materials for emergency power plan and requesting cancellation
of emergency back-up project. SCEOD began work at School Haise on 18 Feb;
BCD is 4 Mar.
F) ESIQN Army Airfield Power: The work request with guidance
has been forwarded to 2rid ASB,
G) 86th Signal BN Power: Plan for commercial power connection
has been forwarded to ARCERR G3.
H) Class IV (Barrier):
1) Concertina: 13,500 rolls available at IOGBASE BRAVO;
2,200 rolls available at 321st NW at DAMMAN.
2) Pickets: 129,000 each, various sizes, available at
LOGBASE BRAVO; 28,000 each, various sizes, are at 321st MMC.
3) Sandbags: 1,283,000(+) at 321st NW and 3,900,000(+) at
LOGBASE BRAVO.
4) Saudi-controlled Class IV at IOM: BG Schardein to meet
with LTC Assaf.
I) Class IV (Construction):
1) Gravel: Gravel is available for pick-up from quarry vic
NS4062. 155th EN 00 (CS) is on site as augmentation.
2) Dust Palliative: 843 barrels (44,679 gallons) available
at IOGBASE BRAVO. Contract for delivery of 9000 barrels (477,000 gallons)
awarded. 1874 of 2000 barrels delivered as of 27 Feb to Ash-Shubah. 4126
barrels to be split between LOGBASES BRAVO and ECHO. RemairL'Ulg 3000
barrels and bulk issue option on hold, but available if needed. cERiccm
RCC14 POC is CPr Alexander.
G+7 PG 3
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997