Document Page: First | Prev | Next | All | Image | This Release | Search

File: 970501_aug96_sagwi2_0064.txt
Page: 0064
Total Pages: 99

Subject = OPERATIONAL SUMMARY   24 FEB 91 G DAY                           

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = COMMAND REPORT  AFTER ACTION REPORT ENGINEER GE CELL                                            

Document Number =          5

Box ID = BX000525







                              3) Crude Oil: Al-Qaysumah punp broken; ARAMOD repairing.
             No BCD. Second access point to line will take two weeks to construct; do
             not anticipate urgent need then. Both Corps indicate continuing need for
             crude oil. 468K gallon remains on order; expect 80K to leave 3 Mar for
             XVIII ABN Corps.
                              4) Airfield Matting: Guidance for the recovery and turn in
             of matting being prepared.
                              5) Harzard Marking Tape: Contractor delivered red/white
             diagonal plastic tape on 26 Feb to 416th ENoct4. Available at EKMC.
                              6) Barbed Wire: RCC14 procuring 20,000 spools through Host
             Nation; delivery delayed to 3 Mar to LOGRASE BRAVO. 14,000 of 45,000 each
             1.7in rebar pickets delivered to I

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997