Subject = OPERATIONAL SUMMARY   24 FEB 91 G DAY                           

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = COMMAND REPORT  AFTER ACTION REPORT ENGINEER GE CELL                                            

Document Number =          5

Box ID = BX000525







             lighting and sanitary facilities. western Site: #2 85% Engineer effort on
             site is complete. There are 22 towers, 320 latrines, and 135 showers on
             site. Digging sumps and improving roads ccntimes. The sanitary lagoon
             is complete. Additional requirmmts for EPW processim are underway.
             #2A 80% 100% of camp is benned. Ihe sanitary lagoon is complete.
             Additional requirements for EPW processing are underway.

                     B)   ENGBIEER ISSUES: N/A

                     C)   PRIORTTV OF WOI;K: Priority is to pipelines, then MSRS.

                     D)   PRIORITY OF SUPPORT: N/A

                     E)   TOPOGRAPHIC SUPPORT: N/A

                     F)   PROPOSED OPM@AMCNS: A new road status reporting system was
             finalized, 27 FEB. A qualitative MSR Report will be submitted daily to
             the ARCERR Engineer beginning 4 MAR, via 416th Engineer Status Report (per
             SOP). A quantitative MSR Report will be submitted weekly by separate
             correspondence.

                 C. ODRPS

                     1. VII OORPS/7TH ENM BDE: Engineer Report #50 032400C MAR 91

                          A) CUFDMU OPERATTONS: VII Corps Engineers continue to
             support maneuver forces. Effort is concentrated in mobility operation and
             denial operations. Engineers support mobility by clearing enemy obstacles
             where needed and improving roads and trails to support resupply. denial
             of enemy equipment and marking of hazardous areas is being conducted by
             engineers assisted by BOD Detachments. NDSA Road is cleared down to the
             Pr 78 E/W Grid Line. VII Corps requested relief from requirement to clear
             southern portion which runs through a complex obstacle. Awaiting response
             from ARCERR.


                          B) ENGINEER ISSUES:

d
             institutionalize the fixes. other units should riot have to continue
             experimentation. Extensive destruction efforts are rapidly depleting
             Corps Stocks for Blasting Caps, Det Cord, Time Fuze, and Fuze Igniters.
             Corps has increased stockage levels. However, theater does not have the
             munitions. ARCERR G4 reports Det Cord, Fuse Igniters, non-electric caps
             and Time fuze will be airlifted into theater. Based on density of enemy
             anum sticks and equipment in VII Corps AO, request all of this equipment
             be designated for VII Corps.












                                                G+7 PG 5

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997