Subject = OPERATIONAL SUMMARY   24 FEB 91 G DAY                           

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = COMMAND REPORT  AFTER ACTION REPORT ENGINEER GE CELL                                            

Document Number =          5

Box ID = BX000525







                            2. Equipment Issues. 7 EN BDE still needs additional 916
             tractor assets to haul heavy equipment. German equipment issue only
             replaces 5 of 23 short. RPV Airfield. lesson learned from this operation
             is that the RPV is a resource eater. It needs its own runway material or
             a different rode of laurich/recovery. Airfield matting, that mist be moved
             every 2-3 days is just rxyt the answer. Explosive sniffing dogs, this
             option for detecting explosives should be explored for use in urban
             areas. current mine detecting devices are ineffective and inefficient on
             modern plastic mines. Replacement platoons arriving without equipment
             (MI13s, 5 Tons, crew-served weapons). Need theater reserve for low
             density engineer equipment, (dozers, scrapers, etc) suggp-st factor from
             doctrinal publications (FMs) and buy or lease ccoup-rcial replacements for
             combat losses.   Dust Palliative TtL@ still needs method of spreading
             palliative. Need to maintain MSRs is critical now as before. As
             hostilities end, can envision use of contract vehicles and drivers. Need
             to reopen the pipeline. Repeat. We are not getting any crude oil.
             Request that the engineer equipment given FNC Forces be replaced by
             theater assets.


                         C)  PRIORITY OF WORK: Not reported

                         D)  PRIORITY OF EFFOEC: Nat reported

                         E)  TOPOGRAPHIC SUPPORT: Not reported

                         F)  PROPOSED OPERATIONS:

                             1. Engineers assigned to 2ACR, LAD and 3AD are supporting
             unit mobility and providing division supply routes. Divisions responsible
             for denial in sector. BDE has Corps rear (EWL is ISPA Road and 1 (UK) AD
             Rear Boundary). BDE will construct two additional MSR from ISPA Road
             forward to divisions.
                             2. Engineers will be prepared to support the defense and
             restoration of Kuwait and redeployment of forces. see a continued need
             for groups and combat heavies for a period of time to do some specific
             tasks. E@oWles include: repair and maintenance of Ali Alsalem Airfield,
             support to units in Kuwaiti Defense, maintenance of MSRs as we redeploy
             XVIII AEN Corps and remove friendly and enemy equipment in Iraq, and
             construction to support living areas/trainuxg areas in vii corps staging
             Areas. Exact tasks, duration of need for groups and heavy units will be
             identified through a detailed planning process.
                             3. Corps Engineer should not be tasked to do any large
             equipment intensive tasks. Focus should be on maintenance of equipment
             for turn-in or redeployment. Most tasks around living area or former unit
             location should be done by contract or each unit. 7 EN BDE units carried
             the brunt of establishing the Corps in sector. 'Ihey, as well as division
             units, cannot be expected to provide the same level of effort during
             redeployment.

                    2. XVIII AEN OORPS/20TH ENM BDE: Engineer Update 031932Z MAR 91








                                              G+7 PG 6

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997