AFZP-VIG
SUBJECT: Quick Look (90DS0013) Class IX Inspection
Material Release Order (MRO) will be produced and the part will
be pulled from the ASL stockage and put into the unit's part
bin. When the part is not available in the ASL, SARSS will
provide i due cut status to the unit through the ULLS 11 status
;process or the AJH-110 Report (Customer Transaction List) and
transfer the request to the DS4. DS4 will transfer the request
to the wholesale system through Corps. which will aive a status
report to DS4. The status is provided to the unit through the
Automated Status Process, Unit Reconciliation List and AJH-110
Report.
3. RESULTS:
a.. GOOD NEWS. Requisition, status and parts are flowing in
the Division. Parts to repair inoperable equipment are being
intensely managed by DMMC and being pushed to the customer.
b. Ttirn-in of disk by units is inconsistent.rethe average
unit does not turn in a disk daily whether they have transactions
or not. This is attributed to a number o-F.reasons:
(1) Computer failure at the unit or@DSUt@.-
(2) Down days.
(35 Transportation problems.
(4) Not knowing the requirement or in some cise@s just
failure to perform the functions.
This results -in unit transactions not being processed timely and
status not available at the unit +or management (Jati.
C. Units in some cases +ail to perform the C-43 process
(Automated Status Update) daily. eAn even laraer problem is the
failure to react to the stattts/infoi-mation provided to the unit
during the status update. Rc?qLtest that are canceled ire not
researched to determine cause of cancellation and reordered.
Request that are released for issued (DA Status) are not
monitored to ensure the part is received within a reasonable
-time. Units do not identify problems to their DSUs when status
has not been received in a timely mariner or appears to be
erroneous.
e. ULLS trained PLL Cleris (76Cs) are a shortage MOS 4,n the
Division. Units have taken mechanics, infantryman, tankers etc.,
to fill th@se shortages. In some cases these soldil-rs were not
properly trained and do not understand the supply system.
Therefore, without constant supervision and guidance they fail to
perform necessary functions.