17. PROJECT: Survivability positions for a British Aviation
Company.
DESCRIPTION: Constructed 150 meters of individual
survivability trenches.
EQUIPMENT: SEE - 8 hours
MAN HOURS: 12
UNIT: B Company, 82nd Engineer Battalion
18. PROJECT; Mlg matting haul, 18 Dec 90.
DESCRIPTION: Hauled M19 matting for air field construction.
EQUIPMENT: M916 - 266 km
MAN HOURS: 40
UNIT: HHC, A Company, 82nd Engineer Battalion
19. PROJECT: Tank Range
DESCRIPTION: Constructed 50 km of 'V' Ditch for the VII Corps
Tank Range. Ditch served to delineate the range border.
EQUIPMENT: Grader - 40 hours
MAN HOURS: 40
UNIT: HHC, 82nd Engineer Battalion
20. PROJECT: Brigade wood haul
DESCRIPTION: Hauled two M916 loads of wood for HHC, 7th
Engineer Brigade to Log Base Alpha from Dammam.
EQUIPMENT: M916 - 1658 km
MAN HOURS: 48
UNIT-. D Company, 82nd Engineer Battalion
21. PROJECT: Brigade equipment haul mission.
DESCRIPTION: Hauled equipment assets for two Combat Support
Engineer Companies. M916 left from Dynamite Base camp drove to
Dammam and returned.
EQUIPMENT: M916 - 1673 km
MAN HOURS: 36
UNIT: D Company, 82nd Engineer Battalion