Document Page: First | Prev | Next | All | Image | This Release | Search

File: 123096_sep96_decls2_0018.txt
Page: 0018
Total Pages: 57

Subject: MEDICAL OPERATIONS DURING OPERATION DESERT STORM 9 NOV 91       

Unit: VAR. BUMED  

Parent Organization: BUMED       

Box  ID: BX303801

Folder Title: VARIOUS BUMED DOCUMENTS FOLDER 6                                                                

Document Number:          2

Folder Seq  #:         10











                                                                     DEPLOYMIENT



                            During the deployment phase, the Navy convincingly demonstrated its ability to
                     quickly move platforms staffed with medical personnel to a theater. Table 4 pro-
                     vides key dates in the activation of naval medical platforn2s in the theater of opera-
                     tions. Table 5 documents the buildup of Navy echelon M beds in theater.



                                         Table 4. Activation of Navy echelon III medical facilities


                                                                             FH-5                FH-6            FH-1 5


                                         Mobilization ordered              8 Aug                4 Doc            4 Dec
                                         Departure date                    9 Aug               14 Doc            31 Doc
                                         Arrived in theater               17 Aug               17 Jan            20 Jan
                                         Unloaded                         21-24 Aug            b                 b
                                         Advance party arrived            24 Aug               24 Jan            28 Jan
                                         Construction began               25 Aug               24 Jan            29 Jan
                                         Operational (500 beds)           12 Sep               4 Feb             12 Feb
                                         Theater standdown date           1 1 Mar              1 1 Mar           15 Apr

                                                                           USNS Comfort                   USNS Marry


                                         Activation ordered                    10 Aug                        9 Aug
                                         Departed CONUS                        14 Aug                       14 Aug
                            Arrived on station                    8 Sep                        16 Sep
                                         Increased to 1.000 bodsa              12 Jan                        8 Jan
                                         Theater standdown date                1 1 Mar                      II Mar


                                         a. Staffed for 500 beds before January personnel augmentation.
                                         b. NotavaiLable.




                            FH-5, which was prepositioned afloat in Diego Garcia aboard MV Noble Star,
                     departed on 9 August in response to the 8 August mobilization order for FH-5 and
                     anchored in the Gulf on 11 August. Unloading did not begin until 21 August because
                     of a change of destination from Dhallran to Al Jubayl. Unloading was completed
                     24 August, the day the air detachment and advance party arrived from Norfolk. The
                     remainder of the personnel arrived I and 2 September. FH-5 was operational with
                     350 beds on 9 September and with 500 beds on 12 September.





                                                                               -9-

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 57 f:/Week-37/BX303801/VARIOUS BUMED DOCUMENTS FOLDER 6/medical operations during operation desert storm:1217961126393
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-37
Box ID = BX303801
Unit = VAR. BUMED
Parent Organization = BUMED
Folder Title = VARIOUS BUMED DOCUMENTS FOLDER 6
Folder Seq # = 10
Subject = MEDICAL OPERATIONS DURING OPERATION DESERT STORM
Document Seq # = 2
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996