Subject: COMMAND CHRONOLOGY 1 JAN 91 TO 28 FEB 91 11 MAR 91
Unit: 1ST CE BN
Parent Organization: 1ST MARDIV
Box ID: BX600020
Folder Title: COMMAND CHRONOLOGY 1ST COMBAT ENGINEER BATTALION JAN -JUN 1991
Document Number: 19
Folder SEQ #: 1
UNCLASSIFIED
UNITED STATES MARINE CORPS
lst Combat Engineer Battalion (-) (Rein)
lst Marine Division (Rein), FMF
FPO San Francisco, California 96608-5519
5750
co
11 Mar 91
From: Commanding Officer, C Company
To: Commanding Officer, lst Combat Engineer Battalion
Subj: COMMAND CHRONOLOGY, 1 JAN 91 - 28 FEB 91
3 Jan 91 - C Company is attached to lst Battalion, 7th Marines
with two platoons. This was to enable two Obstacle Clearing
Detachments (OCD) of platoon size to breach two assault lanes
for 1/7. lst platoon, led by IstLt J.J. Sega, is attached to
Team Tank. 3rd platoon, led by lstlt B.E. Wilhoit, is
attached to Team Mech. lstlt V.J. Sumang and 4th platoon of C
Company are still attached to 3rd Tank Battalion for breaching
operations.
4 Jan-5 Jan 91 - Task Force Ripper FEX at Devil Dog Dragoon
Range. The main focus is toward breaching and marking of the
assault lanes. The terrain, full of sand dunes, does not
allow for realistic training because:
1) Terrain does not compare with Southern Kuwait
2) Terrain does not allow Tank Bn to make full use of the
range of their main gun
3) We are not allowed to fire the line charge.
6 Jan 91 - We moved as a task force further north, but still
45 miles south of Kuwait. The engineer AAVs with fasci-nes
ith the column. The move is
about 65 miles and takes most of the day.
7 Jan-11 Jan 91 - Heavy equipment assets worked around the
clock digging fighting positions for all the vehicles of 1/7.
Heavy equipment available included 1 SEE tractor, 1 tram, 1 T5
dozer and 2 D7 dozers.
7 Jan-2 Feb 91 - The company begins to settle in with 1/7.
Ist platoon is attached with Team Tank and 3rd platoon is
attached with Team Mech. The company HQ is split between 1/7
HQ element and the 1/7 logistics train. Many sandtable briefs
are conducted by 1/7. These included:
DECLASSIFIED
ON: 02 OCT 96
BY: DON GWDP IAW OPNAVINST 5513. SERIES UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 5 f:/Week-38/BX600020/COMMAND CHRONOLOGY 1ST COMBAT ENGINEER BATTALION JAN -JUN 1991/command chronology 1 jan 91 to 28 feb 91 11 m:10049613405717
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-38
Box ID = BX600020
Unit = 1ST CE BN
Parent Organization = 1ST MARDIV
Folder Title = COMMAND CHRONOLOGY 1ST COMBAT ENGINEER BATTALION JAN -JUN 1991
Folder Seq # = 1
Subject = COMMAND CHRONOLOGY 1 JAN 91 TO 28 FEB 91 11 M
Document Seq # = 19
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 04-OCT-1996