                                   LESSONS LEARNED


                                      [MECHANICS]

           5. PROBLEM: TECHNICAL MANUALS WERE NOT AVAILABLE FOR THE
           FOLLOWING CESE THAT ARE PART OF THE TOA AND THERE WERE NO BINDERS
           FOR LOOSE TECHNICAL MANUALS THAT WERE AVAILABLE:


                    - WRECKER
                    - 20K FORKLIFTS
                    - FIRE TRUCK


              SOLUTION: PROVIDE THESE MANUALS (IN BINDERS) AS PART OF THE
           HOSPITAL TOA.


           6. PROBLEM: HAVE BEEN UNABLE TO LOCATE THE HIGH PRESSURE CLEANER
           THAT IS ON THE MASTER EQUIPMENT LIST.

              SOLUTION: ENSURE WHEN THE MASTER EQUIPMENT LIST SHOWS AN ITEM
           THAT IT IS IN FACT PACKED AS PART OF THE TOA.


           7. PROBLEM: THE MECHANIC SHOP WAS SHORTED 8 FEET DUE TO LACK OF
           MECH SHELTER TENT PARTS.


              SOLUTION: ENSURE ENOUGH MECH SHELTER TENT PARTS ARE PROVIDED
           WITH THE HOSPITAL PACKOUT TO ENSURE ERECTION OF ALL SPACES AS
           SHOWN ON THE ERECTION PLANS.


           B. PROBLEM: TOOLS WERE LENT OUT BEFORE THE CTR WAS SET UP.

              SOLUTION: ENSURE PW SPACES. TO INCLUDE THE CTR, ARE SET UP
           PRIOR TO ALL OTHER SPACES.

           9. PROBLEM: THERE WAS NO TIRE REPAIR XIT (PLUGS, PLUGGING TOOL,
           PATCHES OR GLUE) PROVIDED WITH THE HOSPITAL TOA.

              SOLUTION: PROVIDE A TIRE REPAIR KIT WITH THE TOA.

           10. PROBLEM: THE CM SHOP AIR COMPRESSOR DOES NOT HAVE ALL THE
           FITTINGS TO RUN THE LIKES PROPERLY.

              SOLUTION: ENSURE THE CORRECT FITTINGS ARE PROVIDED PRIOR TO
           PACKOUT IN HOSPITAL TOA.

           11. PROBLEM: TOOLS AND EQUIPMENT WERE NOT PACKED ACCORDING TO
           SPECIFIC SHOP, i.e.. CM, BU, UT, etc. AND WERE MIXED IN WITH
           MEDICAL AND OTHER SUPPLIES SIGNIFICANTLY INCREASING THE TIME
           NECESSARY TO BRING THE PW SPACES ON LINE.

K TOOLS AND EQUIPMENT BY SPECIFIC SHOP BEING
           CAREFUL NOT TO MIX WITH OTHER PARTS OF THE HOSPITAL.



                                           7


                                  UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 17 f:/Week-36/BX300052/FLEET HOSPITAL WORKING PAPERS VARIOUS SOURCES CNA 2837/lessons learned debarkation:10049613380410
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-36
Box ID = BX300052
Unit = FLEET HOSP
Parent Organization = NAVCENTCOM
Folder Title = FLEET HOSPITAL WORKING PAPERS VARIOUS SOURCES CNA 2837
Folder Seq # = 11
Subject = LESSONS LEARNED DEBARKATION
Document Seq # = 57
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 04-OCT-1996