                                     UNCLASSIFIED


                                     LESSONS LIAMED

                                       [MECHANICS]

          12. PROBLEM: THE MECHANIC SHOP IS UNDERMANNED GIVEN THE FACT THAT
          THE NCF RECOMMENDS ONE CM BE PROVIDED FOR EVERY SIX PIECES OF
          CESE IN ANY TOA.


          13. PROBLEM: THE LACK OF PRIME AT THE 100 KW GENERATOR FUEL
          INJECTOR PUMPS CAUSED DELAYS IN BRINGING THE GENERATORS ON LINE.
          THREE INJECTOR PUMPS HAD TO BE TAKEN APART TO FREE UP THE
          INJECTOR PLUNGERS THAT WERE STUCK IN THEIR BORES AS A RESULT OF
          PRESERVATIVE IN THE FUEL SYSTEM.


              SOLUTION: PROVIDE LUBRICANT IN THE INJECTOR PUMPS DURING THE
          STORAGE PHASE.


          14. PROBLEM: REPLACEMENT 100 KW GENERATOR BELTS WERE NOT PROVIDED
          IN SUFFICIENT QUANTITY TO KEEP THE GENERATORS ON LINE AS THE
          ORIGINALLY INSTALLED BELTS FAILED (DUE TO DRY-ROTTING), AND
          REPLACEMENT BELTS WERE NOT READILY AVAILABLE FROM LOCAL SOURCES
          IN THE AREA.


              SOLUTION: FLY IN 50 SETS OF REPLACEMENT BELTS AS SOON AS THE
          HOSPITAL IS SITED FOR ERECTION.


          15. PROBLEM: PREVENTATIVE MAINTENANCE ON THE 100 KW GENERATORS
          WAS HINDERED AS NOT ALL POWER GROUPS HAD A BACK-UP GENERATOR.

              SOLUTION: PROVIDE FOR AT LEAST ONE BACK-UP GENERATOR FOR
          EVERY POWER GROUP TO ENABLE PMs TO BE CONDUCTED.

          16. PROBLEM: 100 KW GENERATORS ARE NOT 14ARKED WITH A USN NUMBER
          FOR EASE OF RECOGNITION AND/OR TO FACILITATE PM RECORD
          MAINTENANCE.


              SOLUTION: ENSURE GENERATORS ARE MARKED WITH A USN NUMBER WHEN
          PACKED.


          17. PROBLEM: NO SPECIAL TOOLS WERE PROVIDED IN THE HOSPITAL TOA
          TO CONDUCT SPECIAL MAINTENANCE AND REPAIR TO GENERATORS AND OTHER
          CESE.


              SOLUTION: THE DESIGNERS OF THE HOSPITAL NEED TO KNOW THE
 HOSPITAL AND
          SHOULD PROVIDE FOR SAME IN THE TOA.






                                         UNCLASSIFIED

                                            8

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 17 f:/Week-36/BX300052/FLEET HOSPITAL WORKING PAPERS VARIOUS SOURCES CNA 2837/lessons learned debarkation:10049613380410
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-36
Box ID = BX300052
Unit = FLEET HOSP
Parent Organization = NAVCENTCOM
Folder Title = FLEET HOSPITAL WORKING PAPERS VARIOUS SOURCES CNA 2837
Folder Seq # = 11
Subject = LESSONS LEARNED DEBARKATION
Document Seq # = 57
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 04-OCT-1996