         SUBJECT: Potential Surge for the Chemically/Biologically
         Protected Rigid Wall ISO's (U)

         1.             Lki ement: In order to sustain treatment of
         Casualties in a chemically-biologically contaminated environment
         CB protected rigid wall ISOs will be required..

                            us                    FMS                TOTAL
                            92                                        92


         2. (U) Inventory, Current inventory is 0.

         3.         Surge Capabilities:


              a. (U) Current Program: The ISO hardening effort will
         require three component items. CB resistant gas@..ets ($5,000 ea),
         a hardened ECU C-lo(-.) ($12,0t)O modification) and a M2C) filter
         blower system ($2,000 ea). CB hardening efforts for the gasl@.ets
         and the ECLJ C-IC)C) are in advance research and development. $57-OK
         will be required in order to complete R&D efforts. An additional
         six months will be required to complete R&D on the gas@-:ets and
         the ECU C-10C).


              b.


                  (1).    Ma,; Surge Rate- UN@'.'NOWN
                  (2).    Achieved By: Three months will be required to begin
         production.
                  (3).    Shifts:    UNf.-.'.'NOWN
                  (4).              ons:


         4. (U) Limitina Factors-. a Technical data pac@,age will not be
         available for the CB protected C-100. Sole Source contracting
         authority will be required.

         5. (U) Testing/Safety Implications- Testing of the proposed
         concepts is required to ensure performance with DEPMEDS
         equipment. The risl.. for- surging is considered low to moderate.

         6. (U) LogiStiCS/SLkStainment Impact: The CB protected CIOO
         will replace existing hardware. Modifications Must be completed
         at Depot level.

         7.         Other Information:


   a.    A LIN has not yet been assigned.
              b.    CostData:
                    Total systems required: 92
                    Cost per system: $19,(-)O(-) ea
                    RDT&E $ needed to complete: $530,(-)C)O.
                    Total cost to harden: $2,278,C)OO.
         S. Recommendation: The surge of the CB protected ISO be
         approved.

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 6 f:/Week-36/BX003201/XM28 ADVANCED SIMPLIFIED COLLECTIVE PROTECTION EQUIPMENT FIELDING FOR DEPMEDS/xm28 advanced simplified collective protection e:1011961539042
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-36
Box ID = BX003201
Unit = OTSG
Parent Organization = HSC
Folder Title = XM28 ADVANCED SIMPLIFIED COLLECTIVE PROTECTION EQUIPMENT FIELDING FOR DEPMEDS
Folder Seq # = 23
Subject = XM28 ADVANCED SIMPLIFIED COLLECTIVE PROTECTION E
Document Seq # = 1
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 11-OCT-1996