Document Page: First | Prev | Next | All | Image | This Release | Search

File: 120396_jul96_decls5_0003.txt
Page: 0003
Total Pages: 6

Subject: DESERT STORM SPECIAL STUDY COMMENTS CORRECTIONS                 

Unit: ARCENT      

Parent Organization: CENTCOM     

Box ID: BX000426

Folder Title: OPER DESERT STORM SPEC STUDY PROJ REVIEW SEPT 5  1991                                           

Document Number:         51

Folder SEQ  #:         26




                                                            UNCLASSIFIED




                             DESERT STORM SPECIAL STUDY
                               COMMENT9 / CORRECTIONS



         Page: II-191         Paragraph: DISCUSSION b        Line: 5-9

         As reads: Over 80 percent of the veterinary support in theater was
         from the RC, and many of these units were short critical items of
         equipment to perform the mission. units did not have the equipment
         required to inspect rations for NBC contamination, and there was no
         dairy equipment available.

         Should read:   Over 80 percent of the veterinary support in theater
         was from the RC, and many of these units arrived in theater without
         their authorized and available critical items of equipment to
         inspect rations because of lift constraints. Early availability of
         veterinary expertise was judged to be more critical than the
         arrival of equipment with personnel. Veterinary units would have
         been delayed in arrival were equipment to accompany them.

         Discussion:    RC veterinary units are generally well equipped but
         those deploying to the theater did not bring their equipment with
         them so as not to delay deployment of personnel.     Equipment did
         arrive but did so after deployment of personnel. This was more a
         lift constraint problem as opposed to an equipment shortage
         problem. See ENCLOSURE 4 pertaining to dairy testing equipment.

















                                                                 ENCLOSURE 3

                                  UNCLASSIFIED


                             UU611 IL;Lil I iii,@
                                       WORKING PAPER

                                          WORKING PAPERS

                                            DECLASSIFIED ON 28 Oct 1996 PER SECA Y (DAMH) UP SEC 3.4 EO
                                            12958.

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 6 f:/Week-29/BX000426/OPER DESERT STORM SPEC STUDY PROJ REVIEW SEPT 5 1991/desert storm special study comments corrections:11089615151648
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-29
Box ID = BX000426
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = OPER DESERT STORM SPEC STUDY PROJ REVIEW SEPT 5 1991
Folder Seq # = 26
Subject = DESERT STORM SPECIAL STUDY COMMENTS CORRECTIONS
Document Seq # = 51
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 08-NOV-1996