UNCLASSIFIED
04/19/91
JULLS LONG REPORT
1. (U) JULLS NUMBER: 31931-15055 (00189), submitted by RILEY
AFZN-PTM-C, MR WALTER, 656-2225, (913)239-2225.
2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 03/20/91.
3. (U) KEYWORDS: RWO (REAL WORLD OPS), USA (US ARMY), GUARD
COMPONENT, RESERVE COMPONENT, TRAINING, EQUIPMENT, AUTHORITY,
COORDINATION, SURVIVABILITY.
4. @U) TITLE: Operations: Training-. NBC Task Validation of CS
Chamber Exercise
5. (U) OBSERVATION-. Ist ID (M) had little means in place to
guarantee each soldier was proficient in basic NBC survival..
i I 1 S.
6. (U) DISCUSSION, (a) FORSCOM messages required every
soldier to demonstrate proficiency in named basic NBC survival
skills (CTT) and that each soldier deploy in a correctly fitted
mask.
(b) Ist ID (M) interpreted this literally, but left CTT
training and its certification for completion (validation) to
the unit. Units were to schedule their own visits to the CS
chamber. Units then reported completion to the NBC Division.
(c) Fort Riley Post Chemical instituted Train-the-Ti-ainer
concept for federalized units and personally supervised
validation (individual demostration of proficiency) followed by
a visit to the CS chamber.
(d) The Ist ID (M) left responsibility for validation with
the units. It may not have been completed in some cases. The
Fort Riley Post Chemical method of RC units was thorough but
time and manpower intensive. Participating RC units declared a
great benefit.
7. (U) LESSON LEARNED: Unit validation procedures for NBC CTT
e clarification.
S. (U) RECOMMENDED ACTION: It is a division commander's call
which method is to be used. Perhaps to have MSCs conduct
train-the-trainer for chemical o++icers/NCOs and then inspect
scheduled validation as a middle of the road solution.
9. (U) COMMENTS: none
--- (U) SUBJECT: OPERATIONS
(U) INTEROPERABILITY: TRAINING
(U) Lesson distributed by: LOCAL.
UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996