Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT        

Unit: 1ST ID      

Parent Organization: VII  CORPS  

Box  ID: BX001008

Folder Title: DESERT STORM AFTER ACTION REPORTS                                                               

Document Number:          4

Folder Seq  #:         11






                                       UNCLASSIFIED
                                                                       04/19/91
                                     JULLS LONG REPORT

            1. (U) JULLS NUMBER: 32741-53152 (00247), submitted by RILEY
            AFZN-RM-M, MR HEAD, 856-3535, (913)239-3535.

            2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/05/91.

            3. (U) KEYWORDS: RESOURCE MGMT, ORDERS/GUIDANCE, PLANNING, RWO
            (REAL WORLD OPS), USA (US ARMY), ACTIVE COMPONENT, C2 (COMMAND AND
            CONTROL), LIAISON, PLANS, COORDINATION, TIMELINESS, DIRECTIVES.

            4. (U) TITLE: OPERATIONS: INSTALLATION ANALYSIS AND CONSULTANT
            SERVICES

            5. (U) OBSERVATION: On 22 Oct 90, The Management Analysis
            Division, DRM, was tasked to assist Supply/Services Division,
            DOL, in developing detailed procedures +or the transition of
            logistic support responsibility from DISCOM to Supply/Services
            Division (S/S Div).


            6. (U) DISCUSSION: Assistance was required to develop detailed
            guidance +or Appendix 14 to Annex N, OPLAN LEXICON DANGER, to
            cover the procedures for transition of maps, Class II, Packaged
            procedures and time frame to cover the 30 day period (bubble)
            between the Alert Date and Rail Load Date. Detailed procedures
            and time frames/dates were developed through discussions with
            representatives from DMMC and S/S Div, and presented to S/S Div
            on 25 Oct 90.

            7. (U) LESSON LEARNED: The installation Management Analysis
            Division in the DRM can provide consultant services to analyze
            necessary actions and make recommendations to best accomplish
            those actions. The recommendations included procedures for
            holding and accountability of property, transfer of supply items
            and facilities, dates -For submitting TAC Address Cards,
           .relocation and disposition of supply/property excesses, and
            conducting inventories.

            S. (U) RECOMMENDED ACTION: none required.

            9. (U) COMMENTS:    none



            --- (U) SUBJECT: OPERATIONS


                (U) INTEROPERABILITY: DOCTRINE

                (U) Action managed by: LOCAL, action worked by: , RAP number:
                 Lesson distributed by: LOCAL.








                                       UNCLASSIFIED

                                          @-d 7@

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996