I) Class TV (Construction):
1) Gravel: Gravel is available for pick-up from quarry vic
NS4062. 155th EN CO (CS) is on site as augmentation. 416th ENOOM arid
30th EN BN are working to identify potential aggregate sources in Corps
sectors.
2) Dust Palliative: 843 barrels (44,679 gallons) available
at IOGBASE BRAVO. Contract for delivery of 9000 barrels (477,000 gallons)
awarded. 280 of 2000 barrels delivered on 23 Feb to Ash-Shubah. CPT
Alexander cheddxig delivery status.
3) Cnide Oil: Al--Qaymmah pump broken; ARMM repairing.
No ECD. G4 POL working on second access point to line. Delivery #3 (48K
gal to VII Corps) - lost?, Delivery #4 (120K gal to XVIII ABN Corps) -
contract drivers delivered SOK to VII Corps the rest lost?; Delivery #5
(48K gal to VII Corps) - diverted and arrived at XVIII AM Corps on 26
Feb; Delivery #6 (48K gal to XVIII) - 16K arrived 27 Feb; remainder
enroute; and Delivery #7 (120K gal to XVIII) - departed 27 Feb. Totals:
544K sent, 1361< delivered to XVIII ABN Corps, 136K delivered to VII Corps,
152K MUV.Xte, 120K urknown. Rental truck contract is OBE due to fast
changing tactical situation.
4) Airfield Matting: VIT Corps picked up two sets of
XK-19, but cannot find them at U)GBASE ECHO. LTC Carxlido is trying to
locate. XVIII ABN Corps matting has been delivered to VIC I=ME
A-MME. AM to be delivered to 165th S&S at LOGBASE BRAVO.
5) Harzard Marking Tape: Contractor delivered red/white
diagonal plastic tape on 26 Feb to 416th INCCM; exwolrte to LOGRASE BRAVO.
6) Barbed Wire: RCC14 procuring 20,000 spools through Host
Nation; delivery to start 28 Feb to WGRASE BRAVO. 14,000 each 1.7m rebar
pickets delivered to Ipand Aircraft Parking at KM (C5A) - 70%
complete
NOTE: G4 signed and sent ARCERR AVN cancellation request.
G+3 PG 4
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997