Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Parent Organization = CENTCOM
Unit = ARCENT
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Document Number = 5
Box ID = BX000525
K) MSR Status:
West Range Road - Amber, 43 EN BN's is now BM 1 Mar
East Range Road - Red, has been deferred.
SE Dodge - Green, shoulder work revised ECD is 24 Feb due to
rain delay/damage.
NW Dodge - Green, cold patch work casing minimal traff ic
disruption.
Sultan(Nash) - Green
NW Old Taplirie - Green
SE old Taplirie - Green
XVIII ABN ggmg McRs to UX3RASES RMM and OSCAR
Georgia - Amber 6 lanes; due to rain
Montana - Qmm 6 lanes good to border
TEXELS - Green 2 lanes; due to rain
Ohio - Green 2 lanes good along border
Virginia - Green 2 lanes gravel
Colorado - Green 2 lanes gravel
VII Corps KEY MMs
Green and Blue - Amber both have 10-15 nW holes on each
MSR; plan is to have 109th EN V-ditch drainage.
Black - Green - 2 lanes gravel
L) Water:
1) Five well completion kits are in country with 296th WD
currently with 20th EN BDE. Five well completion kits from the ship Value
are located at the railyard with supocm.
2) VII Corps informed through LOG SITREP on particulars of
pick-up. HHC, 7th EN BDE, requisitioned 2 kits and awaiting pickup by 7th
EN BDE (DOC# WK4FC010560602).
M) Displaced citizen CaTrps: G4/aigineer Task Force on
facility and logistics support for DCs in Iraq and Kuwait completed.
OONPLAN Published and distributed. USAID shelter material for Dcs and
EPWS being flown from Carp Darby, Italy on C-130S. riwo flights arrived
DHAHRAN 26 Feb with 810 rolls. One flight with 190 rolls due 28 feb.
Provided 22nd SUPCCM, ACSLOG, the allocation request.
B. EAC/416TH ENOOM: Engineer Status Report #59 28093OZ FEB 91 and
Cmmkirder's SITREP #73 280930 FEB 91
A) CURRETU OPM@A=ONS: Range Road is Red. 43D EN BN continues
to repair a sub-base failure; EM is 15 MAR to initial standards. SE MSR
Dodge is Amber. Traff ic diversion continues, one way from msR Dodge to
Old Tapline Road between 0800 to 1700 hairs daily to permit required
Shoulder repair. 213 of 224KK have been repaired. The unit will continue
f inal iitprovemnts until 1 MAR, wet weather has continued to impede
progress. All other roads still green. SWAPDOP - Pipeline project:
Phase V 80% 169KM of rigid pipe has been installed. Miree hundred Hauls
are the estimated requirement for this phase. Two-hunderd seventy-four
hauls completed to date. Fuel to Alpha by 1 MAR. Final rigid pipe
G+3 PG 5
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997